Software Earned Value Management (EVM) & QA Risk Telemetry
Calculate real-time CPI, SPI, and VAC for Jira and software teams from verified code-and-test telemetry, skill-adjusted FTE capacity, and blended rate cards.
The 3-Way Reconciliation Framework: Intent ↔ Reality ↔ Cost
Enterprise delivery fails when product backlogs, code repositories, and engineering capacity operate in disconnected silos. Qualonomics provides deterministic triangulation:
Pillar 01 • Intent
The Product Backlog (Jira)
Epics, stories, and acceptance criteria. Eliminates the blind spot where sprint tickets are closed on developer optimism while VP status decks stay green.
Pillar 02 • Reality
Multi-VCS Streams & Autonomous QA
Perforce Helix Core changelists, Git PRs, and Closed-Loop Daisy-Chain QA Test Director with 0–99% predictive failure probability scoring.
Pillar 03 • Capacity & Cost
Constraint-Aware Operatives & EVM
Contractual dailyCapacity × availability guardrails, Period Demand vs. Capacity, Role Activity Distribution Alignment, and Earned Value (CPI/SPI).